CURICULUM VITAE
A. PERSONAL PARTICULARS
Name: MUHAMMAD ARIS IZZUDDIN SREEDHARAN BIN ABDULLAH
Date & Place of Birth: 11th JUNE 1971 / KEDAH, WEST MALAYSIA.
Identification Card Number: 710611-02-5933
Nationality: MALAYSIAN
Correspondence Address: No. 295, Jalan Tun Hussien Onn,
Taman Jasmine, 97000 Bintulu,
Sarawak East Malaysia.
Mobile Phone No: +60167618687.
Email Address: aris_izzuddin@yahoo.co.uk
mlng_tiga@yahoo.com
aris_izzuddin@hotmail.com
B. Education
School / Institution Year Level
Sekolah Menengah Kuala Ketil, Kedah 1988 SPM (MalaysianEducationCerificate)
C. PROFESSIONAL EXPERIENCE
Organization Year Post Held
MLNG DUA DE-BOTLENECKING 2007 – 2009 Electrical Supervisor
PROJECT (Integrated Project Commissioning, Construction
Management Team – IOPMT). & maintenance of electrical
installation up to 33kV
KELLOG, BROWN & ROOT 2004 – 2006 Senior Electrical Supervisor
(JEPAK HOLDINDS SDN. BHD.) Commissioning, Construction
& maintenance of electrical
installation up to 33kV
SAFF TASS SDN. BHD. 2000 – 2003 Electrical Supervisor
Testing, commissioning &
maintenance of electrical
installation up to 132kV.
COLDWIND M&E SDN. BHD. 1997 – 2000 Electrical Supervisor
Supervising & coordinating
Installation & servicing
of Air Conditioning units.
(split unit type, domestic
and commercial)
ELECTEST SDN. BHD. 1992 – 1997 Senior Technician/Team Leader
Testing, commissioning &
maintenance of electrical
installation up to 132kV.
SEAGATE TECH. INTERNATIONAL 1989 – 1992 Facilities Technician
SINGAPORE Maintenance and up keeping
of facilities/production
equipment.
Duties & Responsibilities Held in MDD Project
• Involve in Commissioning of ABB Electrical Network Management Control
System.
• Generator Control and Protection System.
• 6.6KV / 33KV & 415V Distribution and Protection System.
• To coordinate installation, testing, commissioning & servicing of
protection relays, switchgears, transformers and other electrical
equipment & instruments.
• To do planning of installation, testing, commissioning & servicing works
such as:
a. Coordination of job & planning with the contractors.
b. Preparing all equipment for the required job are available
and in good condition with the necessary documentations.
c. Preparing & making sure all safety equipment (PPE) which
needed especially for the workers who are working under my
supervision are complete and in good condition.
d. To make job schedules.
e. To make manpower planning.
f. To prepare documents such as test forms, procedures, manuals
& etc.
• To supervise & implementing safety for works done by contractors:
g. All safety procedure followed accordingly.
h. All works ongoing are on schedule.
i. Ensuring the safety of workers and equipments.
• Submitting all records & documents needed in the completion of work to
the QA/QC & Commissioning Engineer.
• Making sure of all contractor’s testing equipment are always in good
condition and ready.
• Making sure of all critical contractor’s test equipment’s calibration
certificates are valid and has not expired.
• To review & comment contractor’s work procedures and test form required
for all present or future works.
• To give training and guidance to the contractor’s worker under my
supervision.
• To supervise contractor’s workers discipline under my supervision.
• To send report to the contractor whenever there is a defect or
construction error at the related job site.
• To make sure all construction work are done accordance the
specifications required before starting any testing & commissioning
works.
• To meet with QA/QC requirement at work site.
• Follow the rules & regulations of the company policy.
PROFESSIONAL SKILLS
1. Able to carry out testing and other related jobs independently.
2. Experienced in operating, testing, calibrating, maintenance & servicing
of:
• Electrical switchgears, circuit breakers & bus bars from 415 V to
33 kV. (ABB, Tamco, Siemens, EPE, Merlin Gerin & etc.)
• Electrical Transformers & Transformer Protection (Buchholtz, Oil
Temp, Winding Temp, Pressure relief & etc.)
• Protection relays; Over Current Protection, Earth fault
Protection, Voltage Protection, Frequency Protection, Motor
Protection;
4. Generator Protection;
5. Pilot wire Protection
6. Bus-bar Protection
7. Breaker Failure Protection
8. Transformer Differential Protection
9. Experienced in simulating & checking switchgear switching philosophy
according to specification required;
• Inter-trip philosophy & sequence.
• Earthing philosophy & sequence.
• Interlocking philosophy & sequence
• Load shedding philosophy & sequence
10. Able to trouble-shoot switchgear control and protection circuit.
11. Very versed in operating any testing equipment such as;
• Single phase secondary current injector.
• Three phase secondary current injector.
• Conductivity tester.
• Hipot tester AC/DC
• Primary current injector.
• Oil dielectric strength tester.
• Insulation tester & etc.
12. Computer literate on Microsoft Word, Microsoft Excel, Testing equipment
with software controls & etc.
13. Experienced in installing, maintenance & servicing of split type air’
conditioning unit.
Projects & Job involved 2001 – Present
PETRONAS MLNG TIGA Project in Bintulu, Sarawak. 2001 – 2006
1. Executed all testing of protection relays, switchgears, transformers and
other electrical installations & instruments.
2. Involving in the testing & commissioning of MLNG TIGA (Petronas) project
in Bintulu, Sarawak, Malaysia.
• ABB INSUM 2 / MCU 2
• ABB SPACOM RELAYS, Spaj 140C, 110C, 115C, 111C, Spau 140C, Spad 346
etc.
• ABB REF 542 RELAYS
• REL 316*4 (Line differential)
• REG 316*4 (Generator protection)
• GE MULTILIN 489 & etc.
3. High voltage testing of switchgears, bus bars, circuit breakers and
cables from 6.6 kV to 33kV 50Hz system and also 6.6 kV 60Hz (LCI)
system.
4. Power transformer testing including differential stability check.
5. Stability check on 11kV motor on differential protection.
6. Motor protection & motor starter functional check.
7. Assisted ABB & SIEMENS vendor to do testing work & commissioning.
8. Assisted ABB vendor to test & commission ENMC system.
9. Functional check on all switchgear switching philosophy, operating
function and internal circuit check.
10. Commissioning of ABB Electrical Network Management Control System
SHELL CAMPION 7 Offshore Platform, Brunei.2003
1. Assisted ABB Australia to test & commission 11kV system switchgear &
cables for the water injection plant.
2. Tested & commissioned REF 542 PLUS relays.
3. Functional check on all switchgear switching philosophy, operating
function and internal circuit check.
4. Motor protection & motor starter functional check
5. High voltage testing of 11kV system switchgears, bus bars, circuit
breakers and cables.
6. Functional check on all switchgear switching philosophy, operating
function and internal circuit check.
Other Jobs involved
New & Turnaround Yearly Servicing
1. MLNG 1&2 MRR project
2. GDC (Gas & District Cooling) KLIA Sepang Kuala Lumpur, Malaysia.
3. GDC (Gas & District Cooling) Putrajaya, Kuala Lumpur.
4. GDC (Gas & District Cooling) KLCC, Petronas Twin Towers, Kuala Lumpur,
Malaysia.
5. BSAF (M) Sdn. Bhd. (chemical plant) Johor, Kuala Lumpur & Kuantan,
Malaysia.
6. IDEMITSU SM (M) Sdn. Bhd. (Chemical Plant) Johor, Malaysia.
7. Petronas Melaka Refinery PPMSB. (oil refinery) Melaka, Johor.
8. Petronas Kertih Refinery. Terengganu, Malaysia.
9. Petronas Carigali. Offshore platforms. Malaysia.
10. University Technology Malaysia. Johor, Malaysia.
11. Titan (M) Sdn. Bhd. (cracker & Polyethylene plant)
12. Sime Sembawang Ship Yard. (Platform fabrication) Johor, Malaysia.
13. MSE Sdn. Bhd. (Platform fabrication) Johor, Malaysia.
14. University Islam Antarabangsa, Kuala Lumpur.